“Boxes-In-A-Box”

  • Featured :
  • Prize :

Create a “Box-In-A-Box” Concept.

The new complex is the main Box. Two different scale modules, two boxes fill the shell of the complex. The boxes host the two main functions of the swimming center. The main heated competition pool and the smaller training pool along with the baby swimming pool.

The building also contains changing rooms, a bouldering wall, exercise rooms and a restaurant.

The void between the two main volumes is used as a bridge, a transition space. In the building perimeter a transition space is located in-between outdoor and indoor environment, and acts as both buffer space and physical link, other than being functional as circulatory route for the building.

This space creates a spatial continuity and the consequent interaction between public and private space.

Deep cuts are crossing the volume, bring the light inside the pool spaces and create precise visual relationships between the different spaces.

YEAR

2020-2021

LOCATION

DRAMA, GREECE

STATUS

CONCEPT - SCHEMATIC DESIGN
(ON GOING)

Privacy Overview
A&S ARCHITECTS

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Those cookies are:

  • Cookie: moove_gdpr_popup | Provider: asarchitects.gr | Expiry: 1 year | Purpose: Stores the user's cookie consent state for the current domain
  • Cookie: _pll_language | Provider: asarchitects.gr | Expiry: Session | Purpose: Stores the current language