ONASSIS NATIONAL TRANSPLANT CENTER

THE TRANSPLANT STATE IN GREECE IS CHANGING.

The state of the art infrastructure, the cutting edge technology, the specialized personnel and the collaboration with other transplant centers will create a complete framework for all patients.

The ONTRC is going to be a state of the art construction project of a total budget of €100,000,000. It will be equipped with cutting edge technology of more than €30,000,000 worth. The 4 floor building of the ONASSIS NATIONAL TRANSPLANT CENTER will be 7,000 square meters. It will be equipped with 47 new beds, 33 of which exclusively for children and 12 intensive care beds for children, 5 of which exclusively for infants. The construction is estimated to be concluded in 3 years.

Anna Assana was Lead Architect for the architectural design of the project (Concept Design – Schematic Design – Detailed Design).

Architects of the new wing: Studio 75 / A&S ARCHITECTS

Budget: 100 million euros / Onassis Foundation

Project is currently under construction.